The State Patrol Ticket Processing System

page 1 book 199.jpgpage 2 book 199.jpgCIS 510 – Extra Credit.Extra credit requires you to use all of the concepts discussed in this course. There are  sections with each section having  point value. You must have all elements required in each section to receive points for that section. All diagrams must be part of your System Review document placed in the appropriate section. The format is included in this document.Extra credit the case study “The State Patrol Ticket Processing System” (Page 199, Chapter 5).  There are five independent systems.1)  Ticket Processing System2)  Accident and Insurance Verification System3)  Driving Record System4)  Driver License System5)  Patrol OperationsThe first four systems are integrated and share a common database; however, each processes only data specifically identified for the system. This project has a $150,000 budget and must be completed within 4 months. You currently have a staff of two programmers, one tester, one network adminstrator, one database adminstrator, and a State Trooper Officer as a liason.Extra Credit Project (150 points):Your team is required to integrate the Patrol Operations system with the other four. Patrol Operations include all information of the State Trooper (Name, address, Badge Number, Rank), vehicle assigned (Type, VIN, State Number), and patrol area.  Sections 1 and 2 are traditional design approach requirements. Sections 3 and 4 are Object- Oriented design requirements. Section 5 will be a full project scope statement.SYSTEM REVIEW DOCUMENTPROJECT: State Trooper Multi-System IntegrationSYSTEMS ANALYST: PROJECT MANAGER: CLASS: CIS510 – SPRING QUARTERSection 1: Entity Relationship Diagram – Visio or Open Source version (30 points)a)  Current System (15 points)b)  Upgraded System (15 points)Section 2: Data Flow Diagram – Visio or Open Source version. (30 points)a)  Current system (15 points)b)  Upgraded system (15 points)Section 3: Class Diagram – Visio or Open Source version. (30 points)a)  Upgraded systemSection 4: Use Case Diagram – Visio or Open Source version. (30 points)a)  Upgraded systemSection 5: Project Scope Statement (30 points) – Use the format below.Project Scope StatementProject Name: State Trooper Multi-system integration Department: State Trooper IT DivisionProject Manager: Date: Prepared By:Document Owner(s)Project/Organization RoleState Trooper Integration/Systems Analyst/Project ManagerProject Closure Report Version ControlVersionDateAuthorChange Description01Created document.Project Justification (6 points)  Project Identification (6 Points)Solution: Extraneous Work: Work outside of the scope (basically, what will not be done in this project)Other projects:  Project Deliverables (6 points)  Project Objective (6 points)Costs:  Time:  Quality Measures:    Assumptions/Limitations (6 points)

Looking for this or a Similar Assignment? Click below to Place your Order

Open chat
%d bloggers like this: