WBS – Work Breakdown Structure

Section 1: Work Breakdown Structure (WBS)Required Format (MS Project File)Use Microsoft Project or Open Project (.mpp format) to create a WBS in which you:Create 15 or more decomposed work packages into 4 levels that are assigned to 5 or more main tasks (75 line items).Ensure the main WBS tasks headings are the 5 PMBOK® process areas.Create a Work Breakdown Structure Code for each task.Determine an overall project duration and duration estimates for each of the tasks. The duration is not to exceed 90 days.Create accurate work package assumptions and duration estimates.