The State Patrol Ticket Processing System

CIS 510 – Extra Credit. Extra credit requires you to use all of the concepts discussed in this course. There are  sections with each section having  point value. You must have all elements required in each section to receive points for that section. All diagrams must be part of your System Review document placed in the appropriate section. The format is included in this document. Extra credit the case study “The State Patrol Ticket Processing System” (Page 199, Chapter 5).  There are five independent systems. 1)  Ticket Processing System 2)  Accident and Insurance Verification System 3)  Driving Record System 4)  Driver License System 5)  Patrol Operations The first four systems are integrated and share a common database; however, each processes only data specifically identified for the system. This project has a $150,000 budget and must be completed within 4 months. You currently have a staff of two programmers, one tester, one network adminstrator, one database adminstrator, and a State Trooper Officer as a liason. Extra Credit Project (150 points): Your team is required to integrate the Patrol Operations system with the other four. Patrol Operations include all information of the State Trooper (Name, address, Badge Number, Rank), vehicle assigned (Type, VIN, State Number), and patrol area.  Sections 1 and 2 are traditional design approach requirements. Sections 3 and 4 are Object- Oriented design requirements. Section 5 will be a full project scope statement. SYSTEM REVIEW DOCUMENT PROJECT: State Trooper Multi-System Integration SYSTEMS ANALYST: PROJECT MANAGER: CLASS: CIS510 – SPRING QUARTER Section 1: Entity Relationship Diagram – Visio or Open Source version (30 points) a)  Current System (15 points) b)  Upgraded System (15 points) Section 2: Data Flow Diagram – Visio or Open Source version. (30 points) a)  Current system (15 points) b)  Upgraded system (15 points) Section 3: Class Diagram – Visio or Open Source version. (30 points) a)  Upgraded system Section 4: Use Case Diagram – Visio or Open Source version. (30 points) a)  Upgraded system Section 5: Project Scope Statement (30 points) – Use the format below. Project Scope Statement Project Name: State Trooper Multi-system integration  Department: State Trooper IT Division  Project Manager: Date: Prepared By: Document Owner(s) Project/Organization Role State Trooper Integration/Systems Analyst/Project Manager Project Closure Report Version Control Version Date Author Change Description 01 Created document. Project Justification (6 points)       Project Identification (6 Points)   Solution: Extraneous Work: Work outside of the scope (basically, what will not be done in this project) Other projects:     Project Deliverables (6 points)       Project Objective (6 points)   Costs:   Time:  Quality Measures:      Assumptions/Limitations (6 points)       Extra credit requires you to use all of the concepts discussed in this course. There are  sections with each section having  point value. You must have all elements required in each section to receive points for that section. All diagrams must be part of your System Review document placed in the appropriate section. The format is included in this document. Extra credit the case study “The State Patrol Ticket Processing System” (Page 199, Chapter 5).  There are five independent systems. 1)  Ticket Processing System 2)  Accident and Insurance Verification System 3)  Driving Record System 4)  Driver License System 5)  Patrol Operations The first four systems are integrated and share a common database; however, each processes only data specifically identified for the system. This project has a $150,000 budget and must be completed within 4 months. You currently have a staff of two programmers, one tester, one network adminstrator, one database adminstrator, and a State Trooper Officer as a liason. Extra Credit Project (150 points): Your team is required to integrate the Patrol Operations system with the other four. Patrol Operations include all information of the State Trooper (Name, address, Badge Number, Rank), vehicle assigned (Type, VIN, State Number), and patrol area.  Sections 1 and 2 are traditional design approach requirements. Sections 3 and 4 are Object- Oriented design requirements. Section 5 will be a full project scope statement. SYSTEM REVIEW DOCUMENT PROJECT: State Trooper Multi-System Integration SYSTEMS ANALYST: PROJECT MANAGER: CLASS: CIS510 – SPRING QUARTER Section 1: Entity Relationship Diagram – Visio or Open Source version (30 points) a)  Current System (15 points) b)  Upgraded System (15 points) Section 2: Data Flow Diagram – Visio or Open Source version. (30 points) a)  Current system (15 points) b)  Upgraded system (15 points) Section 3: Class Diagram – Visio or Open Source version. (30 points) a)  Upgraded system Section 4: Use Case Diagram – Visio or Open Source version. (30 points) a)  Upgraded system Section 5: Project Scope Statement (30 points) – Use the format below. Project Scope Statement Project Name: State Trooper Multi-system integration  Department: State Trooper IT Division  Project Manager: Date: Prepared By: Document Owner(s) Project/Organization Role State Trooper Integration/Systems Analyst/Project Manager Project Closure Report Version Control Version Date Author Change Description 01 Created document. Project Justification (6 points)       Project Identification (6 Points)   Solution: Extraneous Work: Work outside of the scope (basically, what will not be done in this project) Other projects:     Project Deliverables (6 points)       Project Objective (6 points)   Costs:   Time:  Quality Measures:      Assumptions/Limitations (6 points)  

Looking for this or a Similar Assignment? Click below to Place your Order

Open chat
%d bloggers like this: